Re-roofing with solar panels
on a Shrewsbury home.

Existing solar panels do not prevent a roof replacement, but the roofing and electrical work need clear responsibilities, safe sequencing and a weatherproof fixing plan.

— Practical homeowner guidance

Coordinate two specialist trades

Solar panels, rails, cabling and electrical equipment form a separate system attached to the roof. A competent solar or electrical specialist should isolate, remove, store and recommission the equipment where required; the roofing quotation should state whether that work is included or arranged separately.

Removing panels can expose roof areas that have not been readily visible. The covering, fixing points, underlay and battens should be considered together so that old penetrations are not simply hidden beneath a new installation.

If panels are planned for the future, tell the roofer before the new covering is specified. Roof condition, covering choice, fixing zones, access and cable routes can then be discussed with the proposed solar installer.

— Understand the full roof system

Important details,
explained clearly.

A complete re-roof brings several materials, junctions and practical decisions together. Each section below should be read in the context of your own property and written quotation.

01

Check the solar arrangement first

Before anyone removes equipment, establish who owns it, who is authorised to work on it and whether an installer or provider must be contacted. Warranty or finance terms may affect the permitted contractor and process.

The homeowner should have a clear contact for the electrical isolation, removal, reinstallation and system testing.

  • Ownership or finance documents
  • Original installer details
  • Available warranties and schematics
02

Sequence removal and roof work

Panels normally need to be made safe and removed before the old roof covering is stripped in that area. Scaffold and access should allow both trades to work without damaging stored components or the completed covering.

A shared programme should identify when the roof is ready for mounting equipment and who confirms the weatherproof finish.

  • Safe isolation
  • Labelled removal and storage
  • Roof completion before reinstallation
03

Protect the new covering

Mounting brackets and flashings must suit the selected clay tile, concrete tile or natural slate system. Cutting or forcing coverings around unsuitable hardware can create vulnerable points.

Walking routes and lifting methods should protect completed courses, ridges, gutters and leadwork while panels are returned to the roof.

  • Compatible mounting detail
  • No improvised penetrations
  • Agreed damage responsibility
04

Plan for future solar

A new roof can outlast parts of a solar installation, so maintenance access matters. Share the intended panel layout early and ask the solar specialist about loading, fixing zones and cable routes before roofing details are finalised.

Topline can discuss the roof covering and weatherproofing, while the solar designer remains responsible for the electrical and panel system.

  • Proposed array position
  • Future maintenance access
  • Separate trade warranties

— Useful questions

Questions for both contractors
for your quotation.

Ask for the roofing and solar responsibilities to be written down. Clear sequencing helps prevent a gap where each contractor assumes the other is responsible for access, damage or weatherproofing.

Keep the answers with the written scope so that responsibilities, allowances and exclusions are understood before the deposit is paid.

Request a free roof survey →

Need help with your roof?

Speak to a local
roofer today.

You do not need to know any roofing terms. Tell us what you have noticed and we will explain the next step clearly.

☎ Call usSend enquiry →