Shrewsbury roofers · Free, no-obligation quotations
Not sure what you need?Call 07398 528077

Genuine local workmanship

Completed roofing projects
by the Topline team.

A roofing company should be able to show its own work. Every photograph below comes from a genuine Topline Roofing job—not a stock image.

— Our recent work

Before. During.
Finished properly.

See the visible finish as well as membrane, battens, setting out and safe scaffold access behind the completed roof.

Completed tiled roof and valley detail by Topline Roofing Shrewsbury
Completed tiled roof and valley
Before and after comparison of a garden structure roof renewed by Topline Roofing
Before-and-after roof renewal
Roof stripped in stages with new breathable membrane and timber battens
Membrane and battens during installation
Completed dark roof covering laid in clean straight courses
Clean, even finished courses
Dark roof covering carefully set out across new battens
Roof covering set out on battens
House re-roof with scaffolding and a Topline Roofing Shrewsbury site board
Topline house re-roof in progress

Planning a complete roof replacement?Send your postcode and a short description for a free, no-obligation survey.

Get my free quotation →

— A genuine completed Topline job

A slate re-roof
from strip-off to finish.

The installation photographs are shown in the order the visible work progressed, followed by three views of the finished roof.

  1. Slate roof opened in sections with insulation visible during strip-off
    Stage 1Roof opened in sections

    The old covering is carefully removed so the exposed roof area and accessible parts underneath can be checked as work progresses.

  2. Breathable roof membrane and new timber battens installed with slates ready for relaying
    Stage 2Membrane and battens fitted

    A new breathable layer and fresh battens create the prepared base before the slate covering is laid back across the roof.

  3. Main roof slope prepared with evenly spaced new battens
    Stage 3Main slope prepared

    The batten layout continues across the main roof slope, ready for the covering to be installed in measured courses.

  4. Slate roof covering being installed around a valley during a Topline re-roof
    Stage 4Slating reaches the valley

    The slate covering is installed across the prepared roof while the valley and surrounding junctions are brought towards their finished detail.

Final stage

Completed slate re-roof

The finished views show the completed slate courses, chimney junction and valley from several angles. The photographs were taken from the scaffold before it was removed.

Completed slate roof slope and chimney detail by Topline Roofing Shrewsbury
Finished slate courses and chimney detail
Wide view of the completed slate roof slopes and valley
Completed roof and valley from safe scaffold access
Completed adjoining slate roof slopes meeting at the valley
Finished adjoining slopes and valley line
Project statusCompleted re-roof

The roof covering and visible junctions shown in this case study were completed before these final photographs were taken.

— What good project photos prove

Not only the finish.
The work underneath.

A finished photograph shows the appearance of a roof, but the installation photographs help explain the weatherproof system below it. New membrane, correctly spaced battens and careful setting out all matter before the final covering is completed.

During strip-off, we can also see parts of the roof that were hidden by the old covering. If an unexpected concern becomes visible, it can be discussed before additional work is agreed.

Read about underlay, battens and timbers →
Before and after comparison of a renewed garden structure roof

— Before and after

A tired roof renewed
with a neater finish.

This side-by-side view shows the clearest evidence of improvement: the original weathered roof and the completed covering after the work. Before-and-after photographs help customers judge the visible result without us publishing a private address.

  • Original condition recorded
  • Completed appearance shown clearly
  • Customer privacy protected
New roof membrane and battens fitted while part of the old covering remains

— During installation

Weatherproof layers
before the covering.

This stage shows new membrane and battens being fitted while the job progresses across the roof. Working in planned stages helps manage the exposed area and creates the measured base for the new covering.

  • New breathable layer
  • Fresh timber battens
  • Measured preparation
Completed tiled roof slopes meeting at a valley detail

— At completion

Consistent courses
across every roof slope.

The completed view shows the roof covering aligned across adjoining slopes and finished around the valley. This is where accurate setting out and attention to water pathways become visible.

  • Evenly aligned covering
  • Clear valley water path
  • Finished roof checked at completion
GOOGLE REVIEW
“We went out to five different companies and found Roofers Shrewsbury to be value for money and their service was by far the best. Thank you for your really awesome work.”

David HartGoogle customer

Need help with your roof?

Speak to a local
roofer today.

You do not need to know any roofing terms. Tell us what you have noticed and we will explain the next step clearly.

☎ Call usSend enquiry →